Karnataka Expansion Watch, 18 November 2026 (free sample)
Every week we list the companies coming to the industrial corridors around Bengaluru that our clients ask about, so you hear of them before they start looking for space.
Where the approvals are
Each circle is a corridor around Bengaluru, sized by acres on file in this issue. Select one to jump to it. Not to scale.
Acres on file, by corridor
All stages, as approved
Where each file stands
Number of units by stage
Names to watch
A robotics and CNC plant pulls machine shops and spares stockists in around it.
The rest of the requirement goes looking for leased space.
Growing this fast before it builds means renting in between.
Machinery arrives a year before the factory. That gap is a lease.
This week in one minute
- Nine park and warehouse developers were cleared for about 517 acres between them. That is new competing supply for anyone holding sheds in Doddaballapur, Devanahalli, Kolar and Hoskote.
- Adinarayanahosahalli is the busiest single address. Seven separate units were approved there in one meeting, from liquid oxygen to satellites.
- Kolar's Jakkasandra approvals come with a catch. Four projects worth Rs 650 crore can only get land once farmers withdraw old High Court cases.
- The companies below have been planning for months. Most of them still need somewhere to work while they build.
Investment and jobs are what the companies stated. Acres are what was approved, which is sometimes less than was asked for.
Doddaballapura and Adinarayanahosahalli
13 itemsSee all 13 rows
| Company | Approved for | Acres | Rs Cr | Jobs | Stage |
|---|---|---|---|---|---|
| SFO Technologies | Electronic and machined parts, metal finishing for aerospace | 7 (asked 25.49) | 490 | 2,500 | ApprovedApproved. Land from the Science Park reserve, Adinarayanahosahalli Phase 2 |
| Bellatrix Aerospace | Spacecraft, satellites and launch vehicles | 4.15 | 404 | 339 | ApprovedApproved, Adinarayanahosahalli Phase 1 |
| Praxair India | Liquid oxygen and nitrogen | 5 (asked 6) | 210 | 40 | ApprovedApproved, Phase 2 |
| Bulk Liquid Solutions | Flexi tanks and FIBC bags for export | 8 | 110 | 735 | ApprovedApproved, Phase 2 SEZ |
| JJG Special Processing | Aerospace special processing | 2 | 80 | 250 | ApprovedApproved, Phase 2 SEZ |
| Synthesis Winding Technologies | Capital equipment for winding | 6.5 (asked 7) | 71.75 | 250 | ApprovedApproved, Phase 2 |
| Rhewum India | Expansion: screening machines, conveyors, spares | 1.5 | 16.5 | 80 | ApprovedApproved, Phase 2 SEZ |
| Elmeasure India | Data centre energy management, power products | 3.25 (asked 5) | 150 | 500 | ApprovedApproved, Phase 2 |
| Vijay Gems and Jewellery Manufacturers | Jewellery manufacturing | 9.69 | 150 | 500 | ApprovedApproved. Plot bought inside a 30 acre KIADB holding at Veerapura |
| Jampana Construction | Integrated park: warehousing, logistics, ancillary units | 127.30 | 465 | 2,500 | ApprovedApproved. At least 60% must be industrial |
| Jaswin Ventures | Industrial park and township, Sunnappanahalli | 100.41 | 475 | 12,000 (stated) | ApprovedApproved. Land still to be acquired by consent, 59 acres consented so far |
| Balajikrupa Projects | Plug and play space for manufacturing and R&D, plus a hotel | 3.39 | 25 | 100 | ApprovedApproved, own land at Konnaghatta |
| Bhairaveshwara Enterprises | Warehouse and logistics, Madhure Hobli | 2 | 20 | 80 | ApprovedApproved, own land |
What it means
- Adinarayanahosahalli has turned into an aerospace and electronics address. Seven units in one meeting is a cluster forming, not a coincidence.
- Most of these plots are 2 to 8 acres and none of them is built. Expect requests for 10,000 to 40,000 sq ft of ready space nearby while the factories go up.
- SFO asked for 25 acres and got 7. When a company gets a third of what it wanted, the rest of the requirement goes looking for leased space.
- Jampana and Jaswin add over 225 acres of park land. That is future supply, but neither will have finished sheds for a while.
- Landlords around Doddaballapur with good power and clear height should expect calls from aerospace suppliers first.
Aerospace Park and Devanahalli
8 itemsSee all 8 rows
| Company | Approved for | Acres | Rs Cr | Jobs | Stage |
|---|---|---|---|---|---|
| Fanuc India | CNC systems, industrial robots and machines | 40 (asked 50) | 850 | 1,500 | RecommendedRecommended. Goes for final approval next. Devanahalli General Industrial Area Phase 2 |
| Cornerstone Property Developers | Multi sector industrial park | 100 | 688.80 | 40,000 (stated) | RecommendedRecommended for final approval. At least 60% industrial, flatted factories allowed |
| Vasantham Trans | Free trade warehousing zone | 5 | 50 | 150 | ApprovedDeferred in March, approved in June. Plot 19, Aerospace SEZ. Needs SEZ authority sign off |
| Aradhana Enterprises | Electronics, automation and software | 2, sub leased | 60 | 500 | ApprovedApproved, inside the CDC park, Aerospace Park Phase 1 |
| Innomech Aerospace Toolings | Change of use to manufacturing plus a free trade warehouse | 0.6 | 120 | Not stated | Change approved, subject to SEZ rules |
| Brigade Estates and Projects | Aerospace and defence components | 25 | 475 | Not stated | Two more years to build, a five star hotel added to the plan |
| Centum Industries | Precision electronic modules | 2.5 | 25 | Not stated | Construction has started. One year extension |
| Exide Energy Solutions | Lithium ion cells, modules and packs | 80 | 6,002 | Not stated | RecommendedRecommended for more time, up to FY 2030 to 31, with no further extension |
Also on file: PMI Technology India (Taiwan), 15.87 acres sub leased in the Aerospace Park, Rs 1,000 crore, 800 jobs.
What it means
- Fanuc is the name to watch. A 40 acre robotics and CNC plant pulls in machine shops, integrators and spares stockists around it.
- Cornerstone's 100 acres will compete for the same tenants as existing Devanahalli sheds once it builds, but that is years out, not months.
- Two free trade warehouse approvals in one corridor tell you that bonded storage near the airport is in demand.
- Exide's deadline moving to 2030 means its supplier wave is slower than people assumed. Don't price for it this year.
- Brigade adding a hotel to an industrial plot is a sign that the airport side is being read as mixed use, which supports land values.
Tumakuru, Vasanthanarasapura and Dabaspet
7 itemsSee all 7 rows
| Company | Approved for | Acres | Rs Cr | Jobs | Stage |
|---|---|---|---|---|---|
| Minamida India (Japan) | Cold forged and machined steel parts | 6 (asked 7.25) | 70 | 50 | ApprovedApproved at the Tumakuru Machine Tool Park. The company has said machinery by Sep 2026 and mass production in Dec 2027 (Machinist, Jan 2026) |
| Ten machine tool units | CNC rotary tables, gear blanks, electrodes, precision parts and more | 19.5 in total | 209 in total | Not totalled | ApprovedAll approved at the Tumakuru Machine Tool Park. Largest: UCAM, 5 acres, Rs 40 crore, 150 jobs |
| Shree Damodar Coach Crafts | Sleeper bus bodies | 8 | 30 | 250 | ApprovedApproved, Vasanthanarasapura 3rd Phase |
| Himil Hi-Tech Electronics | Electronics manufacturing | 9 (asked 10) | 49.98 | 150 | ApprovedApproved, Dabaspet 5th Phase |
| DhaSh PV Technologies | Solar junction boxes, cables, connectors | 20 | 346.35 to 490 | Not stated | Approval moved to a group company, project cost revised |
| Varaha Land, Hicotronics Devices, Marvel Technology and Tools, Novel Tissues | Forging, electronics, precision parts, home care | 4 to 10 each | 35 to 96 each | 100 to 342 each | DeferredDeferred. Watch the next meeting |
| Jyothsna Li-Tech | Lithium ion cells at Sira | 1 | 50 | Not stated | Asked for three more years to start |
What it means
- The Machine Tool Park is filling with small units of 1 to 5 acres. Small firms like these rent before they build, and they want 5,000 to 20,000 sq ft.
- Minamida's own timeline puts machines in the country well before its plant is ready. That gap is a lease.
- Three Dabaspet proposals were deferred in one sitting. Deferred files come back, so these are next month's leads.
- Bus body building at 8 acres needs tall sheds and open yard space. Few ready sheds on this road offer both.
- Lithium cell projects keep asking for more time. Treat battery demand on this corridor as slow.
Kolar, Narasapura, Vemagal and Malur
19 itemsSee all 19 rows
| Company | Approved for | Acres | Rs Cr | Jobs | Stage |
|---|---|---|---|---|---|
| Hikaru IAL Asset | Industrial park, warehousing, logistics | 30 (asked 61.4) | 422.69 | 600 | ApprovedApproved, KGF Industrial Area |
| Orbit Industrial Park | Logistics and industrial park | 30 (asked 40) | 454 | 1,100 | ApprovedApproved, Bavanahalli |
| Jurojin Developers | Industrial and logistics park | 38.2 | 137 | 1,500 | ApprovedApproved. Includes about 30,780 sq m already built at Narasapura |
| Aequs Industrial Park II | Industrial park | 100 | 221.20 | Not stated | Transfer of approval from Aequs SEZ ratified, KGF |
| Unimech Aerospace and Manufacturing | Aero tooling, precision parts, structures | 20 | 200 | 800 | ApprovedApproved, KGF |
| Aries Refinery | Precious metal concentrate processing | 14 | 157.45 | 300 | ApprovedApproved, Bavanahalli |
| Farcom Cable Systems | Plastics and compounds for auto parts | 10 | 129.75 | 600 | ApprovedApproved, Bavanahalli |
| APL Apollo Building Products | Galvanised steel pipes and tubes | 10 | 90 | 75 | ApprovedApproved, Bavanahalli |
| Mechpark | Precision engineering products | 4 | 50 | 50 | ApprovedApproved, Bavanahalli |
| Innovative Fab Systems | Facade systems, windows, steel structures | 3 (asked 13) | 49 | 200 | ApprovedApproved, KGF |
| Meghmilan Pipes | HDPE pipes and fittings | 4 | 60 | 150 | ApprovedApproved, KGF |
| Gold Field Modern Dairy | Milk chilling plant | 7.75 | 52 | 450 | ApprovedApproved, KGF |
| Sterling Tools | Fasteners, expansion | 2.91 | 44 | 100 | ApprovedApproved, Vemagal |
| Poddar Plumbing System | PVC and CPVC pipes | 10 more | 758 rising to 1,250 | Not stated | RecommendedRecommended for final approval, Vemagal 2nd Phase |
| Sonder Projects and Lands | Park for EV component makers | 32 | 200 | 400 | ApprovedApproved on condition (see below), Jakkasandra, Malur |
| Sonder Infra | Park for display and instrument cluster makers | 29 | 180 | 400 | ApprovedSame condition |
| Arete 22 | Aluminium wheel parts for two wheelers | 14 | 200 | 200 | ApprovedSame condition |
| Aratt Alchemy Essence | Tiles, granite processing, fabrication | 12 | 70 | 400 | ApprovedSame condition |
| Venugopal Agro Foods | Food products | 3.82 | 70.20 | 20 | ApprovedApproved, Malur |
What it means
- Kolar got the most park land of any corridor this month. Hikaru, Orbit, Jurojin and Aequs account for about 200 acres of park and logistics land.
- Jurojin already has buildings on site. That is the only park here that could offer space within months rather than years.
- The four Jakkasandra projects can only get land once farmers withdraw High Court cases that date back to 2013. Count them as maybe.
- Bavanahalli is filling with mid size manufacturers of 4 to 14 acres. Their vendors will want small sheds on the Kolar side of the highway.
- If you own warehousing between Hoskote and Narasapura, your competition from new parks starts here, not at Hoskote.
Hoskote
2 itemsSee all 2 rows
| Company | Approved for | Acres | Rs Cr | Jobs | Stage |
|---|---|---|---|---|---|
| YJ Link India (Korea) | SMT automation equipment | 4.56, bought | 177.96 | 173 | ApprovedApproved. Plot at Chokkahalli bought from another KIADB allottee |
| RMZ I&L Project (Hoskote) | Industrial and logistics park | 29.9, own land | 198.62 | 100 | ApprovedApproved, M. Hosahalli, Nandagudi Hobli |
Also on file: Volvo Group India, Nandagudi, Rs 1,500 crore, 1,700 jobs.
What it means
- YJ Link bought a ready plot instead of waiting for allotment. Foreign entrants on a deadline do that, and they also rent.
- RMZ's 30 acres are in Nandagudi Hobli, the same area as Volvo's expansion. Expect Grade A sheds aimed at Volvo's suppliers.
- Only two Hoskote names this month. The corridor is busy, but the paperwork is running behind the ground.
- Truck parts and kitting demand from Volvo is the steady base here. Smaller sheds near Nandagudi stay easy to let.
- Landlords east of Hoskote should watch the RMZ timeline. A big institutional park sets the rent ceiling for everyone around it.
Harohalli and Bidadi
3 itemsSee all 3 rows
| Company | Approved for | Acres | Rs Cr | Jobs | Stage |
|---|---|---|---|---|---|
| Shinko Nameplate India (Japan) | Name plates and automotive emblems | 2.5, then 1.8 more (4.3 total) | 96.17, then 100 total | 100 | ApprovedApproved in March, more land approved in June. Harohalli 5th Phase |
| Toyoda Gosei South India (Japan) | Painted bumpers for cars | 7,300 sq m inside its existing site | 82.91 | Not legible | ApprovedApproved, Toyota Techno Park, Bidadi |
| Stovekraft | Cast iron cookware | 7.4, own land | 40.97 | Not stated | Asked for three more years to build |
What it means
- Japanese auto suppliers keep choosing this side of the city. Two of them in one quarter follow the Toyota base at Bidadi.
- Shinko came back within three months for more land. A company that grows that fast before it builds will need rented space in between.
- Toyoda Gosei is expanding inside its fence. Its overflow is stores and finished goods, which means warehouse demand near Bidadi.
- Small plots of 2 to 5 acres at Harohalli suit tier 2 suppliers who want to be within an hour of the OEM.
- If you hold sheds on the Kanakapura or Mysuru road with good truck access, Japanese supplier enquiries are worth chasing now.
See warehouse and shed rents at Harohalli, warehouse and shed rents at Bidadi.
South: Jigani, Attibele and Bommasandra
2 itemsSee all 2 rows
| Company | Approved for | Acres | Rs Cr | Jobs | Stage |
|---|---|---|---|---|---|
| Laxmi Steel Overseas | Warehousing for FMCG, electronics, pharma and furniture | About 5 (20,391 sq m), own KIADB land | 29.77 | 60 | ApprovedApproved, Bommasandra |
| Lake Chemicals | Bulk drugs | About 2 (7,998 sq m) | 16.10 | Not stated | Two more years to build |
From public announcements this year: GT Emissions Systems (UK) commissioned its Jigani plant and says it is adding capacity. Syrma SGS Elemaster opened a plant at Bommasandra in September. Merck added production at its Jigani campus.
What it means
- The south side shows up thin here because most of its growth is on private land and leases, not new KIADB plots.
- A 5 acre warehouse at Bommasandra built on industrial land is a landlord adding supply, not an occupier arriving.
- Electronics names keep arriving at Bommasandra and Jigani. Their expansions usually go to leased space near the existing plant.
- Pharma and chemical units need approvals that take time. Expect slow, steady demand rather than a rush.
- For landlords here, the better signal is the company announcement, not the government paper. We track both.
See warehouse and shed rents at Jigani, warehouse and shed rents at Anekal, warehouse and shed rents at Bommasandra.
How to read this issue
- Approved means the project has State approval for its land. Recommended means it has passed an earlier review and a final decision is still to come. Deferred means it will come back.
- We list companies only. We never publish the names of promoters, directors or officials.
- Investment and job numbers are what the company stated. Many projects take years, and some never happen. Use this as an early signal, not a promise.